Increased costs resulting from failure to procure ships spare parts competitively or directly from the manufacturer
Read Online
Share

Increased costs resulting from failure to procure ships spare parts competitively or directly from the manufacturer Department of the Navy by United States. General Accounting Office

  • 688 Want to read
  • ·
  • 69 Currently reading

Published by [s.n.] in [Washington] .
Written in English

Subjects:

Places:

  • United States.

Subjects:

  • United States. Navy -- Procurement.,
  • United States.

Book details:

Edition Notes

Cover title.

Statementreport to the Congress of the United States, by the Comptroller General of the United States.
Classifications
LC ClassificationsV800 .U64
The Physical Object
Pagination3, 49 p.
Number of Pages49
ID Numbers
Open LibraryOL5902681M
LC Control Number63065000
OCLC/WorldCa18493958

Download Increased costs resulting from failure to procure ships spare parts competitively or directly from the manufacturer

PDF EPUB FB2 MOBI RTF